One fine day there was a real fever at the Hillwood Olesnica construction site. Bremer negotiated and agreed on every detail with us with such verve that everyone was sure that this hall would be a real engineering masterpiece. 🔨🏗️

Workers from the BMS had their hands full with cables, sensors and wires everywhere. Someone even hooked them up and started moving around like a character from a science fiction movie. "BMS-Man!" he shouted, giving out virtual commands. But he quickly came back down to earth, after all, the electrics were within our scope, too. ⚡🔌

When it came to adjusting the building for the increased number of tenants, the engineers were a bit perplexed. "Originally there was supposed to be one tenant, and now there will be five!" sighed one of them. But they quickly found a solution, after all, an engineer's imagination knows no bounds! 🧠💡

In the meantime, to check that everything was going according to plan, we ordered fire tests. After a positive reception, a show and water rocket demonstrations by firefighters were arranged. 🚒💦🎆

And about the P3 duct cart charging station from Hivent (https://hivent.pl/) said everyone with appreciation. "This is just the future!" they enthused. 🔌🔋

In the hall, our team took care of the installation of gas, ventilation and water. The rooms in the hall became quite an electric wonderland. Electric radiators and heaters were boiling at their best, and the air conditioning was blowing cool as an Arctic wind. ❄️❄️❄️

The office building was our kingdom. The complex installations and overhead exchanges were impressive. "It's like the center of a space station!" laughed our installers. 🌌🏢

But after all, without the white assembly, nothing would be as it should be. Workers flew around the building turning knobs and sanding down the final details. 👨‍🔧🔩

And the server room? There it was just something! The air conditioning was running as if the lives of all the servers depended on it. "This is our digital Fort Knox!" laughed the IT workers. 💾🖥️

Thanks to our equipment, the whole project was like out of a space movie. Systema gas radiant heaters and Apen Group gas heaters made everyone feel like they were on a tropical island. Sinclair, Rotenso and Innova air conditioning took care of the comfort of all the building's users. And Alkaster gas detection made sure everyone was safe. 🏝️🌡️

Aerostar air handling units were bustling, like the heart of the entire operation. And Itron gas meters made sure no one got cheated on billing. ⚙️📊

Thus was born Hillwood Olesnica - an engineering masterpiece, where every tenant could feel as if they were in the realm of the magic of technology. All those who worked on the construction could be proud of themselves. 🏗️🌟

Most importantly, we still service all the installed equipment and systems at the facility today. This is a great honor for us and proof of the quality of our solutions!

#BuildingMaster #Bremer #BMS #CompleteInstallations #ABuilding Automation #Electrics

A Comprehensive Approach

We offer a comprehensive service - from consulting, design and construction, to warranty and service.

Experienced staff

We guarantee to work with engineering personnel with design and execution rights.

A personalized approach

We will tailor solutions to the requirements specifically related to your investment.

Timeliness

We attach importance to attention to detail and timeliness of execution of orders entrusted to us.

Contact with us

Aby wypełnić ten formularz, włącz obsługę JavaScript w przeglądarce.
Consent to privacy policy